Talon
Engineering OS
Search or ask
⌘K
Projects
IFC Viewer
Fire Alarm Placements
Thermal Load Calculation
SOW Check
Business Development
AI Search
CAD Search
Web Search
Library
Operations
RECENT PROJECTS
DEMO
Snow Load Calculation
MH
Maxi Hernandez
maxi@talon.io
Toggle Sidebar
Business Development
/
Proposals
/
Loading…
Loading…
Toggle Sidebar
Business Development
/
Proposals
/
Proposal · South Austin Water Main Rehabilitation Phase 2
Back
draft
South Austin Water Main Rehabilitation Phase 2 · City of Austin
Save
Export
# South Austin Water Main Rehabilitation Phase 2 ## Executive Summary Eagle Engineering proposes to provide professional engineering services for the South Austin Water Main Rehabilitation Phase 2 project. Our team has extensive experience with municipal water infrastructure in the Austin metro area, including similar projects for the City of Round Rock and Williamson County. ## Scope of Services - Condition assessment and prioritization of existing water mains - Design of rehabilitation alternatives (CIPP, pipe bursting, open cut) - Preparation of plans, specifications, and cost estimates - Construction phase services and resident engineering ## Project Approach We will leverage our in-house hydraulic modeling capabilities and GIS integration to optimize rehabilitation sequencing and minimize service disruptions. Our approach aligns with the City's 2024 Water Master Plan objectives...
AI Score
82
Overall fit vs. RFQ criteria
Matched projects
Riverside Drainage Improvements
City of Springfield · 2.4M
Main Street Widening
TxDOT · 1.8M
Downtown Utilities Relocation
Metro Water District · 1.2M
Gattis School Road Drainage
City of Round Rock · 980K
Suggested team
Sarah Chen
Senior Engineer · Water/wastewater
John Smith
Principal · Client relationship
Alex Rodriguez
Engineer · Hydraulic design
Improvement suggestions
Add specific references to similar projects completed in the Austin metro area.
Emphasize CIPP and pipe bursting experience — align with RFQ requirements.
Include a brief project approach diagram or timeline in the executive summary.
Strengthen the construction phase services section with resident engineering hours.